A brewery needs steam at the hour it brews. The cheapest electricity may arrive several hours earlier. In Portugal, HEINEKEN, EDP and Rondo Energy signed an agreement that puts a store of hot bricks between those two clocks. Their November 2025 announcement describes a 100 MWh heat battery at a brewery and malting plant near Lisbon. Electricity from on-site solar and the grid would charge it. Rondo would supply the battery. EDP would deliver steam to the brewer under a service agreement. The project announcement sets out what the brewer expects to receive once the equipment is running. Rondo’s project announcement

Different European industrial decarbonisation events cover different parts of that decision. For the price and availability of power, choose European Industrial Energy Days in Rotterdam. For storage and its integration with industrial heat, look at Copenhagen’s Thermal Energy Storage Symposium. For suppliers and competing equipment, consider Hannover. For an unresolved project decision involving several parties, consider The Decision Room in Zürich. We publish this guide and organise the Zürich gathering. We checked the event details on the 7th of November 2026.

One date that separates the energy buyer from the engineer

European Industrial Energy Days, Rotterdam, the 10th and 11th of March 2027, includes a case session on what sits behind the wholesale electricity price on an industrial bill. For the person signing a power contract, that is a reason to go. A few cheap hours on the market can make an electrification proposal look attractive. The site still has to be able to draw power in those hours, pay the applicable network charges and keep production running when the price changes. Rotterdam programme

The Thermal Energy Storage Symposium, Copenhagen, the 11th and 12th of March 2027, overlaps Rotterdam on the 11th. The Danish Technological Institute organises it with the Technical University of Denmark. Its specialist scope includes integration, modelling and industrial use of heat storage. A project engineer who already knows the duty the plant must supply has a reason to go straight to Copenhagen. Copenhagen symposium

Return to the brewery. The battery’s 100 MWh refers to the amount of energy it can store. Rondo’s proposed 7 MW of steam refers to the rate at which heat can be supplied. The operator also needs to know whether steam will be available at the right pressure when a production shift begins. Put the site’s heat demand, the power it can draw and its non-negotiable production hours on the same daily chart. Send one colleague to Rotterdam with the charging window and another to Copenhagen with the discharge requirement. They can come back and test two halves of the same proposition.

A supplier exhibition or a combustion conference?

Europe Energy Week in Hannover, the 5th to the 8th of April 2027, combines an energy exhibition and conference alongside Hannover Messe. An engineering team comparing equipment can use that format. Give suppliers the same duty profile and installation window and ask where each would need a site measurement before putting its name to an offer. A specification sheet for maximum output rarely answers a question about how to keep the line running during the changeover. Hannover event

For someone investigating combustion in an industrial furnace, the International Flame Research Foundation conference, Houlgate, Normandy, the 10th to the 13th of May 2027, is the specialist event. Its remit includes furnaces, fuels and diagnostics. Its dates overlap Climate Week Zurich. An engineer deciding what to test in the furnace has a reason to choose Houlgate. A site director who has two viable technical options but no agreement about power capacity or risk has a different reason to travel. IFRF conference

Who buys the equipment, and who buys the heat?

The Portuguese agreement makes the distinction concrete. A brewer can contract for steam while another party takes responsibility for parts of the plant and power arrangement. A factory considering such a structure should ask who owes it usable heat at the agreed moment, what happens if output is interrupted and how the supplier recovers its investment. Two systems with similar efficiency can put those obligations on different balance sheets.

If your question spans the wider electricity system and its investors, the Energy Transition Summit, Amsterdam, the 21st and 22nd of April 2027, offers that perspective. Its Energy Investors’ Exchange is invitation-only. Check how access works if that discussion determines whether to attend. Future of Utilities

The Decision Room meets independently during Climate Week Zurich in May 2027. The proposed energy discussions examine when it is worth paying to resolve a power constraint and what one project still needs before an investment committee can consider it. Bring the connection offer or its current status, the latest acceptable commissioning date and the alternative the site would choose if power arrived a year late. That gives the operator, network and financing teams a common decision to examine.